BREEAM Material efficiency
Contents |
[edit] Aim and benefits
To recognise and encourage measures to optimise material efficiency in order to minimise environmental impact of material use and waste.
[edit] When to consider
At the preparation and Brief Stage, RIBA Stage 1. The credit requires decisions and actions taken at this stage to be documented for evidence. An updated or revised document should then be recorded at each key stage.
[edit] Step by step guidance
Identify opportunities to optimise the use of materials in the building design, procurement, construction, maintenance and end of life. Investigate and implement appropriate measures in line with these.
This needs to be carried out at each of the following RIBA Stages:
· Stage 1 - Preparation and Brief
· Stage 2 – Concept Design
· Stage 3 – Developed Design
· Stage 4 – Technical Design
· Stage 5 – Construction
Opportunities could include using fewer materials, reusing demolition or strip out materials and using materials with a higher recycled content. They could also include utilising off site prefabrication.
[edit] Questions to ask while seeking compliance
Has this been started at RIBA Stage 1? Whilst this may not be in the same format as later stages there does need to be something recorded on materials considerations at this stage otherwise the credit shall not be achievable.
[edit] Tools and resources
WRAP Designing out Waste: A design team guide for Buildings
BS 8895 Designing for material efficiency in building projects
[edit] Tips and best practice
Awaiting content
[edit] Typical evidence
Usually a table of considerations made at each stage, perhaps against work packages, combined with a brief report from the relevant responsible party to describe the work undertaken in this area during each stage. Provide meeting minutes, drawings, specifications etc. if referenced to show how the work has influenced the designs.
[edit] Applicable Schemes
The guidelines collated in this ISD aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- List applicable schemes here
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
Featured articles and news
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.