BREEAM Material efficiency
Contents |
[edit] Aim and benefits
To recognise and encourage measures to optimise material efficiency in order to minimise environmental impact of material use and waste.
[edit] When to consider
At the preparation and Brief Stage, RIBA Stage 1. The credit requires decisions and actions taken at this stage to be documented for evidence. An updated or revised document should then be recorded at each key stage.
[edit] Step by step guidance
Identify opportunities to optimise the use of materials in the building design, procurement, construction, maintenance and end of life. Investigate and implement appropriate measures in line with these.
This needs to be carried out at each of the following RIBA Stages:
· Stage 1 - Preparation and Brief
· Stage 2 – Concept Design
· Stage 3 – Developed Design
· Stage 4 – Technical Design
· Stage 5 – Construction
Opportunities could include using fewer materials, reusing demolition or strip out materials and using materials with a higher recycled content. They could also include utilising off site prefabrication.
[edit] Questions to ask while seeking compliance
Has this been started at RIBA Stage 1? Whilst this may not be in the same format as later stages there does need to be something recorded on materials considerations at this stage otherwise the credit shall not be achievable.
[edit] Tools and resources
WRAP Designing out Waste: A design team guide for Buildings
BS 8895 Designing for material efficiency in building projects
[edit] Tips and best practice
Awaiting content
[edit] Typical evidence
Usually a table of considerations made at each stage, perhaps against work packages, combined with a brief report from the relevant responsible party to describe the work undertaken in this area during each stage. Provide meeting minutes, drawings, specifications etc. if referenced to show how the work has influenced the designs.
[edit] Applicable Schemes
The guidelines collated in this ISD aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- List applicable schemes here
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
Featured articles and news
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.
The changed R&D tax landscape for Architects
Specialist gives a recap on tax changes for Research and Development, via the ACA newsletter.
Structured product data as a competitive advantage
NBS explain why accessible product data that works across digital systems is key.
Welsh retrofit workforce assessment
Welsh Government report confirms Wales faces major electrical skills shortage, warns ECA.
A now architectural practice looks back at its concept project for a sustainable oceanic settlement 25 years on.
Copyright and Artificial Intelligence
Government report and back track on copyright opt out for AI training but no clear preferred alternative as yet.
Embedding AI tools into architectural education
Beyond the render: LMU share how student led research is shaping the future of visualisation workflows.
Why document control still fails UK construction projects
A Chartered Quantity Surveyor explains what needs to change and how.
Inspiration for a new 2026 wave of Irish construction professionals.
New planning reforms and Warm Homes Bill
Take centre stage at UK Construction Week London.
A brief run down of changes intentions from April in an onwards.
Reslating an ancient water mill
A rare opportunity to record, study and repair early vernacular roofs.
CIOB Apprentice of the Year 2025/26
Construction apprentice from Lincoln Mia Owen wins this years title.
Insulation solutions with less waste for a circular economy
Rob Firman, Technical and Specification Manager, Polyfoam XPS explains.
Recycled waste plastic in construction
Hierarchy, prevention to disposal, plastic types and approaches.
UK Net Zero Carbon Buildings Standard V1 published
Free-to-access technical standard to enable robust proof of a decarbonising built environment.